Moonhouse
Hakuto-R Mission 2, also called Resilience, was a robotic lunar landing mission launched on 15 January 2025. Developed by the Japanese company ispace, the lander was intended to deliver a small rover manufactured by the company's European subsidiary, as well as other payloads. Like Hakuto-R Mission 1, this mission served as a technology demonstration, with the final goal of providing reliable transportation and data services on the Moon.
Moonhouse

Holger.Ellgaard · CC BY-SA 3.0
- Name
- Hakuto-R Mission 2 Resilience
- Period
- 2004.
- Region
- Sweden.
- Related practice
- aluminium.
VALÉORINE Encyclopedia
VALÉORINE documentary reading
Documentary summary
Hakuto-R Mission 2, also called Resilience, was a robotic lunar landing mission launched on 15 January 2025. Developed by the Japanese company ispace, the lander was intended to deliver a small rover manufactured by the company's European subsidiary, as well as other payloads. Like Hakuto-R Mission 1, this mission served as a technology demonstration, with the final goal of providing reliable transportation and data services on the Moon.
Admitted source layer · organised and presented by VALÉORINE
Reference Check
Propose documentary evidence for Moonhouse. A contribution is never written directly as fact: identity, source, rights and evidence gates still decide.
Sign in to contribute
World of VALÉORINE
Documentary connections
Only confirmed graph relationships appear here. Images are shown only when their identity and reuse rights both pass the documentary gate.
Documentary evidence
Documentary basis
Authority files
wikidata · Q18653703 · wikipedia · Moonhouse
In this article
Overview
Overview
The lander was named RESILIENCE. Communications were lost approximately 90 seconds before the projected landing and the lander crashed on the Moon.
It is recorded as the work of Mikael Genberg. Materials recorded for it are aluminium. It is associated with Sweden. The record gives 2004 as its date of establishment or first appearance. Recorded genres are conceptual art and architectural sculpture.
Key facts
Key facts
• Name — Hakuto-R Mission 2 Resilience • Mission Type — Lunar landing, technology demonstration • Operator — ispace • Website — https: ispace-inc.com/m2 • Spacecraft — Hakuto-R Resilience • Spacecraft Type — Lunar lander • Spacecraft Bus — Hakuto-R • Manufacturer — ispace • Launch Mass — ~ • Dimensions — Width: Height: • Launch Date — 2025 1 15, 06:11:39 UTC (1:11:39 am EST) • Launch Rocket — Falcon 9 Block 5 (B10855), Flight 425 • Launch Site — Kennedy, LC-39A • Launch Contractor — SpaceX • Programme — Hakuto-R • Previous Mission — Mission 1
Background
Background
The project began development after Hakuto-R Mission 1 in 2023. The mission used the same overall design with upgrades from flight data collected in mission 1.
Lander specifications
Lander specifications
The RESILIENCE lander stood 2.3 m high, 2.3 m wide and had a weight of 340 kg. The lander included a micro rover planned to perform an in situ resource utilization demonstration.
Mission timeline
Mission timeline
• Illustration — Falcon 9 rocket at Kennedy Space Center shortly before the launch of Blue Ghost Mission 1 and Hakuto-R Mission 2 The lander completed successful vacuum testing in June 2024. The rover, later to be integrated with the lander, was completed in August 2024. In November 2024, the lander had arrived at the launch site in Florida. The mission was launched on 15 January 2025 at 06:11:39 UTC (1:11:39 am EST, local time at the launch site) on a Falcon 9 Block 5 launch vehicle. The lander successfully carried out a flyby of the Moon by 15 February, and was expected to land no earlier than 6 June. The significant difference in landing dates between it and Blue Ghost, launched at the same time, is due to choice of a longer trajectory in order to save energy. The space probe successfully reached lunar orbit on 6 May. On 28 May, the spacecraft performed an orbital control maneuver that brought it into a circular lunar orbit about 100 km above the surface. The mission was scheduled to land on Thursday, 5 June, at 19:17 UTC, assuming the primary landing spot in the middle of Mare Frigoris was chosen. If ispace decided to use one of the three backup landing sites, those attempts would occur on different times. On 5 June 2025, the lander failed to complete its landing, impacting the lunar surface. On 24 June 2025, the company released a technical analysis identifying an anomaly in the Laser Range Finder (LRF) as the cause of the hard landing.
Landing site
Landing site
• Illustration — Mare Frigoris The intended landing site for the mission was in the far northern Mare Frigoris (60.5 degrees north latitude and 4.6 degrees west longitude), a northern location still allowing continuous line-of-sight radio communication from Earth. The three backup landing sites are also located in Mare Frigoris. This is the same general area of the Moon targeted by Hakuto-R Mission 1 in 2023. However, ispace did not attempt to land Hakuto-R 2 in Atlas Crater.
Rover
Rover
• Illustration — TENACIOUS rover The mission included a rover called TENACIOUS, designed and manufactured in Luxembourg, which was planned to explore the area around the landing site after being lowered to the lunar surface from the lander. TENACIOUS is the first European-built lunar rover. It was developed with co-funding from the Luxembourg National Space Programme (managed by LSA, implemented by ESA). The rover was carrying Moonhouse, a Falu red miniature cottage artwork designed by Mikael Genberg. The Moonhouse homepage doesn't afterwords directly mention the crash, but concludes "It was never about going there. It was about being here", presenting the impact coordinates and concept images as evident success.
Lander payloads
Lander payloads
In addition to the rover, the RESILIENCE lander carried payloads from Takasago Thermal Engineering Co., Euglena Co., National Central University, and Bandai Namco Research Institute, Inc. The lander also carried a memory disk co-developed by UNESCO and Barrelhand, which contained UNESCO Constitution's Preamble in 275 languages and other cultural artifacts.
Communication
Communication
The European Space Agency (ESA) supported the mission's operations by providing communication services using its ESTRACK network of antennas. The rover TENACIOUS was to be controlled from ispace Europe SA's control centre in Luxembourg. The commands were to be first sent to ESA's ESOC in Germany and then relayed through the ESTRACK antennas to the Moon. Communications were lost just before the projected landing, due to the lander crashing on the Moon.
Chronology
Dated record
Chronology
The full dated record · 1 entries
2004
Moonhouse first recorded.
Literature
Scholarly footprint
A count of publications is evidence of attention, not of standing, and is given here only as a measure.
Notes from the source article
Cited by Wikipedia
Notes from the source article
These works are cited by the source article, in its own numbering. They are recorded as its citations, not as sources VALÉORINE has verified.
- 1.Hakuto-R M1, M2. Gunter's Space Page.
- 2.ispace, Inc. ispace Announces Mission 2 Landing Date Set for June 6, 2025 (JST). 4 March 2025.
- 3.ispace Announces Mission 2 with Unveiling of Micro Rover Design. ispace.
- 4.Dickinson, David. Japanese Resilience Lander Crashes on the Moon. Sky & Telescope. 2025-06-06.
- 5.Clark, Stephen. A Japanese lander crashed on the Moon after losing track of its location. Ars Technica. 2025-06-06.
- 6.Dixit, Mrigakshi. Japan's ispace aims for moon landing in 2024 with upgraded lander. Interesting Engineering.
- 7.Alamalhodaei, Aria. Despite setbacks, ispace to launch second moon mission in Q4 2024. TechCrunch. 16 November 2023.
- 8.ispace RESILIENCE Lunar Lander Successfully Achieves Testing Milestone in Preparation for Mission 2. ispace.
- 9.ispace's lunar rover arrives in Japan to prepare for 2nd space probe. Kyodo News+.
- 10.ispace. space Mission 2 RESILIENCE lunar lander Arrives in Florida for Final Launch Preparations. 27 November 2024.
- 11.Buckle up! Our road trip to the Moon is set to launch at 1:11 a.m. EST on Wednesday, Jan. 15. 1876641220845244788. 7 January 2025.
- 12.ispace Completes Success 5 of Mission 2 Milestones. ispace. 15 February 2025.
- 13.Potter, Ned. The Many Planned Moon Landings of 2025 (and Beyond). IEEE Spectrum. 24 February 2025.
- 14.Japan's Resilience moon lander arrives in lunar orbit ahead of June 5 touchdown. Space. 7 May 2025.
- 15.Private Japanese spacecraft aims to land in the moon's 'Sea of Cold' this week. Space. 2025-06-02.
- 16.What time will Japan's ispace Resilience probe land on the moon on June 5?. Space. 2025-06-03.
- 17.ispace Updates Timing for Expected Touchdown on the Lunar Surface to 4:17 a.m. JST. ispace.
- 18.ispace Releases Technical Cause Analysis for HAKUTO-R Mission 2. ispace.
- 19.ispace Announces Launch Timing, RESILIENCE Lander Progress, and Planned Lunar Landing Zone During Mission 2 Update Press Conference. ispace-inc.com. 12 September 2024.
- 20.ispace-EUROPE announces Completion of First European Designed, Manufactured, and Assembled Lunar Micro Rover. ispace-inc.com. 25 July 2024.
- 21.ESA supports Moon mission carrying first European rover. www.esa.int.
- 22.Sveriges Radio. Swedish wooden cottage on the way to the Moon. 15 January 2025.
- 23.SVT Kultur. Västeråsarens månhus har åkt ut i rymden. 15 January 2025.
- 24.Burrau, Bill. Nu har månhuset lämnat Jorden. Ny teknik. 15 January 2025.
- 25.The house is on the Moon.
- 26.UNESCO. UNESCO’s Lunar Mission: Preserving Humanity’s Languages and Cultures on the Moon. www.unesco.org. 10 May 2024.
- 27.Garofalo, Meredith. Private lunar lander to carry 'memory disk' of 275 human languages to the moon in 2024. Space.com. 8 May 2024.
- 28.Luscombe, Richard. Second attempt by Japanese company to land on moon likely ends in failure. The Guardian. 5 June 2025.
References
Citations
References
Each reference names the institution holding it, so a reader may go to the document itself.
reference work
Secondary witnessreference work
Secondary witness
Connections
Knowledge graph
Connections
Each connection was recorded deliberately, with the basis for it kept on the internal record.
Place
1- SwedenPlace
Established from a fact already recorded on a verified source.
The Encyclopedia exists whether or not anything is for sale. Corrections are recorded rather than overwritten, and every version of this record is kept. Published 16 August 2026.
Elsewhere in Furniture
924 published records in this field, each with its sources named.
- monitor mountTerminology
- monoblocTerminology
- Monument of Jana z Głogówa in GłogówTerminology
- Monumental clockTerminology
- Morgan CasketTerminology
- motorcycle seatTerminology
- mounting blockTerminology
- Mourners' benchTerminology
Best supported in this field
For owners
Own an object connected with Moonhouse?
A specialist will read what you send and tell you what the house can establish, what it cannot, and whether the object is suited to sale. There is no charge and no obligation. The object stays with you throughout; nothing is shipped to us unless it is arranged in writing beforehand.