AGM-137 TSSAM
The Northrop AGM-137 TSSAM (Tri-Service Standoff Attack Missile) was a standoff cruise missile developed for the three branches of the United States Armed Forces, hence "tri-service". Missile development began in 1986 but revelation of cost-overruns in 1991 prompted the Army to pull out of the project and an investigation of the procurement process by the General Accounting Office (GAO, now referred to as the Government Accountability Office). The TSSAM program was eventually cancelled in December 1994 pursuant to a GAO recommendation and the loss of support of the United States Army after going as far as several test launches.
Also recorded as Northrop AGM-137 TSSAM · Tri-Service Standoff Attack Missile · TSSAM
AGM-137 TSSAM
- Name
- AGM-137 TSSAM
- Field
- cruise missile
- Region
- United States
Reference Check
Propose documentary evidence for AGM-137 TSSAM. A contribution is never written directly as fact: identity, source, rights and evidence gates still decide.
Sign in to contribute
World of VALÉORINE
Documentary connections
Only confirmed graph relationships appear here. Images are shown only when their identity and reuse rights both pass the documentary gate.
Documentary evidence
Documentary basis
Authority files
wikidata · Q292433 · wikipedia · AGM-137 TSSAM
In this article
Key facts
Key facts
• Name — AGM-137 TSSAM • Type — Stealthy stand-off precision weapon • Origin — United States • Is Missile — y • Service — did not enter service • Manufacturer — Northrop • Engine — Williams F122-WR-100 turbofan • Vehicle Range — + • Guidance — INS With GPS updates Infrared terminal guidance • Launch Platform — Proposed B-52H B-1B B-2A F-16C/D A-6E F/A-18C/D
Development
Development
The United States Air Force began developing the Tri-Service Standoff Attack Missile (TSSAM) in 1986; the intent was to produce a family of stealthy missiles for the U.S. Air Force, Navy and United States Army which would be capable of long range, autonomous guidance, automatic target recognition, and sufficient accuracy and warhead power to be capable of destroying well-protected structures either on land or at sea. All versions of the missile would use inertial navigation aided by Global Positioning System (GPS). The Navy and one Air Force version were to use an imaging infrared homing terminal sensor to recognize the target and terminal homing, and would be fitted with a unitary warhead. A second version Army missile would be launched by two booster rockets and carry the Combined Effects Bomblet (CEB) submunition against land targets. It was planned to carry the missile on the B-52H, F-16C/D, B-1, B-2, A-6E, and F/A-18C/D; the Army version was to be launched from the MLRS (Multiple Launch Rocket System) vehicle. In 1991 the previously black budget figures for TSSAM were revealed, showing a roughly 6 billion dollar cost overrun over the original contract price. This prompted a GAO investigation into the procurement process which resulted in the recommendation that the project be cancelled. The project suffered from budgetary problems, some related to the distribution of the budget between the three services. This resulted in funding shortfalls and delays. The missiles also suffered from technical development issues, pushing the unit cost from the original 1986 figure of $728,000 per missile to $2,062,000 in 1994. The project which was intended to be used by all three services (hence, Tri-service), lost Army support in 1993 and was canceled as a result. Technology developed for the TSSAM was used in the JASSM program.
Places
Named by the record
Places
Only places the record itself states, plotted where the house gazetteer settles their coordinates. Nothing is inferred from a name or a nationality.
- United States
Named but not plotted · 1
AGM-137 TSSAM is associated with United States.
Country
Text attribution
Licensing
Text attribution
Part of the biographical narrative on this page reuses licensed material. Its origin, revision and licence are recorded here.
The biographical narrative on this page is based on the Wikipedia article AGM-137 TSSAM, revision 1216915431 (EN edition), by its contributors. VALÉORINE has edited that text and built its own documentary record around it. The reused material is available under CC BY-SA 4.0, and this page's reuse of it is offered under the same licence. Everything else on this page — the chronology, the holdings, the evidence, the plates and the connections — is VALÉORINE's own record. Sources and licences.
Notes from the source article
Cited by Wikipedia
Notes from the source article
These works are cited by the source article, in its own numbering. They are recorded as its citations, not as sources VALÉORINE has verified.
- 1.Dupont, Daniel G. Army Kills Tssam, Sadarm-MLRS, Avenger to Fund Pay Raise, Retirement Pay. Inside the Army. 5. 2. 1–9. 1993. 2164-8182.
- 2.Missile Development: Status and Issues at the Time of the TSSAM Termination Decision. General Accounting Office. 20 January 1995.
- 3.LeSueur, Stephen C. From $8.9-billion to $15.1-billion: COST OF TRI-SERVICE MISSILE JUMPED 70% BEFORE PROGRAM WAS PUBLICLY UNVEILED. Inside the Pentagon. 7. 47. 1–7. 1991. 2164-814X.
- 4.Morrison, David C. Shining light on the 'black' budget. Lasers & Optronics. 10. 9. September 1991.
- 5.LeSueur, Stephen C. Dod Ig, Gao to Probe Reports of Cost Overruns in Top-Secret Tssam Program. Inside the Pentagon. 7. 39. 1–7. 1991. 2164-814X.
- 6.Missile Development: TSSAM Production Should Not Be Started as Planned. General Accounting Office. 8 October 1993.
- 7.Bolkcom, Christopher. Missiles for Standoff Attack: Air-Launched Air-to-Surface Munitions. Congressional Research Service. 4–5. 17 October 2000.
- 8.Terpak, John A. Cruise Missile Controversy. Air Force Magazine. Air & Space Forces Association. 29 May 2018.
- 9.Access Intelligence, LLC. Air Force seeks $50 million addition for TSSAM replacement. Defense Daily. 187. 28. 10 May 1995.
References
Citations
References
Each reference names the institution holding it, so a reader may go to the document itself.
reference work
Secondary witnessreference work
Secondary witness
Connections
Knowledge graph
Connections
Each connection was recorded deliberately, with the basis for it kept on the internal record.
Broader subject
1- cruise missileTerminology
Established from a fact already recorded on a verified source.
The Encyclopedia exists whether or not anything is for sale. Corrections are recorded rather than overwritten, and every version of this record is kept. Published 14 August 2026.
Elsewhere in Militaria
6,095 published records in this field, each with its sources named.
- AGM-129 ACMTerminology
- AGM-130Terminology
- AGM-131 SRAM IITerminology
- AGM-136 Tacit RainbowTerminology
- AGM-153Terminology
- AGM-154 Joint Standoff WeaponTerminology
- AGM-158 JASSMTerminology
- AGM-158C-1 LRASMTerminology
Best supported in this field
For owners
Own an object connected with AGM-137 TSSAM?
A specialist will read what you send and tell you what the house can establish, what it cannot, and whether the object is suited to sale. There is no charge and no obligation. The object stays with you throughout; nothing is shipped to us unless it is arranged in writing beforehand.